top of page

Driveway: Part 2 of 3

ntjames5

We layed Geotextile fabric and ABC base gravel to our 30' by 100' driveway. We dropped 51 tons of ABC base gravel. No way this can be spread by shovel and wheel barrel. The final gravel layer (clean gravel) will get applied in early Spring 2023. It will be about 35 tons. This time delay will allow the base gravel layer to shrink and solidify. Meanwhile, we can still park (and 🥳) on the driveway. Here are some construction photos:



Comments


(919) 213-1333

©2024 by Crimson Cardinal LLC

bottom of page